Silo Equipment Technical Agreement
(Wall Frame)
Catalogue
Geographical and Environment
Equipment introduction, working principle, technical parameters and the processing technology, etc.
The scope of supply and supply list
5.Equipment supervision and inspection
Packaging and anti-corrosion
Equipment supervision and inspection
Documents, drawings list and its sending time
Design review, technical services and after-sales service
The geographical position engineering environment
Altitude: 1200~1400mm
Ambient Temperature: Highest Temperature:+40℃ Lowest Temperature:-5℃
Maximum Relatively Humidity: 80%
Monsoon Thunder: Area with more lightning activities.
Drive AV Voltage: 380V Frequency: 50HZ (Incoming line Voltage: 11000V)
Equipment Instruction, Technical Parameters and Technical Process
Summary
The machine is a set machine with electricity, liquid technology as one of high performance, full-automatic cold roll forming line. The whole machine is composed of feeding and decoiling system, feeding guided system, roll forming system, cutting after forming system, finished product rack, electric control system and hydraulic system.
Final Technical Parameters after fixing (Red items are fixed one.)
Number |
Item |
Parameters |
Remark |
||
1 |
Suitable Raw Material |
Type |
Galvanized steel sheet |
||
Thickness |
1.0-2.5mm |
Should be conformed within 7 days after signed the contract |
|||
(mm)Width | |||||
2 |
(m/min)Forming Speed |
0-17 |
Including Cutting off Time |
||
3 |
Forming Station |
22 |
Based on the final design |
||
4 |
Main Forming Machine Motor Power |
11KW |
Based on the actual design |
||
5 |
Main Motor Hydraulic Power |
5.5KW |
Based on the actual design |
||
6 |
(KW)Total Power |
16.5KW |
Based on the actual design |
||
7 |
Source |
AC380V,50Hz,Three-Phase |
|||
8 |
Dimension |
10×1×1.5 |
Based on the actual objects |
||
9 |
Lead Time |
45 |
|||
10 |
Sprocket |
20A double |
|||
11 |
Chain |
We adopted 20A-2 |
|||
12 |
Bearing |
6210 |
|||
13 |
Bearing Block |
130 |
|||
15 |
Wall Plate |
The thickness of wall plate is 20mm |
|
||
16 |
Drawbar |
22mm |
|
||
17 |
Roller Material |
Cr12Mov |
The quenched hardness is 58 degree |
Process
Decoiling→ Guided Feeding→ Roll Forming→Correction→ Cutting to Length→Collectioin
Supply Range and List
★ Feeding Guided Platform
Set the left and right guide device on the feeding inlet of main motor, keep raw material sheet and roll forming system in the right position. The guiding position should be adjusted by manual screw mechanism, and it can be adjusted from left to right independently.
★ Roll Forming System
1)5.5KW;Forming Main Motor Power: 11KW
2) The roll forming system is composed of frame, transmission parts and cold forming roller group.
3) The frame was manufactured segmentally and connected by all pats, the profile was welded integrally.
4) The roller adopts bearing steel, and processed by forging, precision CNC machining and polishing the surface after plating chromium.
5) The roller axle adopts bearing steel and it has been quenched and tempered; its support structure type is conjoined wall plate.
6) The gear reducer motor and chain transmission drive lower roller group rotating, some of up and down roller adopt gear transmission.
7) Adjusting the clearance of up and down roller by manual screw to fit for rolling different thicknesses of sheets. The tolerance of finished plate will change due to different strength and thicknesses of baseboard.
★ Cutting after Forming System
The cutting system is composed of cutting frame, cutting mold, guiding device, cutting cylinder and cutting hydraulic station.
1) The cutting frame adopts welding frame type with well integrally stiffness.
2)The forming mold which the use of cutting mold fits the across-section of sheet will reduce distortion on cut-off point, use cut method to cut off, does not produce waste; the cutter blades material is Cr12 and has been quenched and tempered.
3) The guiding device adopts sliding block structure, which can keep the blade cut off the plate stably under the pressure.
4) The power of cutting off is provided by main motor hydraulic station, hydraulic station motor power:5.5 KW
★ Finished Product Rack
The rack was mainly used to place finished plate after forming to facilitate the handing of operators. This racking device is composed of two racks which the width meets the requirement of finished plate and the length is 2 meters. The frame is welded by square pipe profile, and sets numbers of automatic rotated supporting rollers according to the features of the transmission on the top, the bottom is composed of adjustable screws which can coordinate the height of finished plate in a certain range.
★ Electronic Control System
1) The system adopts PLC control and frequency control technology to realize the automatic production of whole machine.
2) The system provides a friendly human-computer interface that can set batch, working length and numbers
3) Operating type: Touch screen and buttons.
4) Encoder Count has the function of number counting and length counting.
5) PLC. Omolon PLC is been used.
★ Universal correcting head
1. Correction Structure: 3D Turkey correction head, It can be adjusted from left to right to make sure of straightness.
2. Shaft diameter: 58mm
3. Material: Cr12Mov
★ Hydraulic System
1) External independent hydraulic station is adopted (provides the power for cutting off)
2) Main valve parts are domestic well-known brands.
Quality and Inspection Standard of Equipment
The quality of equipment references the enterprise standard.
Inspection Standard: Quality objections are efficiency with 30 days after the commissioning is qualified.
Package and Anticorrosion
Machine is packed nude, the little piece and accessories are packed in wooden box.
6.1 Factory Inspection
6.2 Site acceptance testing item
6.3Site unpack acceptance and inspection
Documents, drawings list and sending time
7.1 Basic requirement
We will provide four sets of drawings and data for the manufacturing within 15 days after the contract was signed.
7.2 Project Design Files Delivery
1) The relative drawings of outline, and basic design requirement.(See figure below)
Data with the machine
1) Equipment factory qualified certification
2) Manual of equipment installation, assembly, operation and maintenance.
3) Other technical files and data about installation, operating and maintenance requirement.
4) Provide a detailed list of supporting manufacturers and supporting parts
5) Other relative data.
8. Design examination, technology service and after-sale service.
The warranty period is one year. In the warranty period, the supplier is responsible for repairing the quality loss caused by the buyer, but the buyer must be in charge of cost.